The
first sentence of this section indicated that we should have at least 3/4"
of plexiglass exposed under the tape line. Evidently, it also means you trim the canopy bottom edge,
leaving 3/4" below the tape line - I sure didn't catch that one... Again, I
used my 3" high speed air cutter (Harbor Freight Model de-Thrifty, $9.99)
to do the job
.
Notice I got my
full armor on because it kicks up plastic projectiles to all directions, but it makes a fast cut. I also took time to round off the inside edges
of the canopy (per Wayne Hicks' suggestion) with my palm sander for glassing down the road.
Throughout the trimming and sanding process, there were a few
times I got pretty close to dinging/scratching the canopy, I decided to take some
action...
There
were many discussions in the Cozy forum on ways to protect the canopy. I have
been using the shrink wrap cover that came with the canopy. After rolling the
cover back for taping, it never wanted to
stay put. I decided to try spray lat instead. I picked a quart up from Aircraft
Spruce and tried it on a sample first. It looks like a small can of white paint. I
brushed it on and it dries within 15-20 minutes. Within an hour, it turned
clear and peels off clean. I was impressed... I brushed 3 layers on both the
outside and inside of my canopy with a SOFT brush - took me about a couple of
hours and maybe 1/4 of a quart.
From what I gathered from other builders sites, carving out the foam skirt is
quite a tedious task. In addition, it is not clear if the foam/canopy interface
needs to be a perfect, good or loose fit. Instead of the 50-60 individual blocks
of foam, I decided to approach it differently...
The idea...
Based on my initial measurements, the highest point of foam/canopy interface
(tape line) is 2 11/16" above the longerons, therefore, I decided to start
with 3" thick foam blocks - bare with me here, it'll become clear as we
move on... [Hindsight]
I eventually reduced it to 2 1/4" for better visibility.
I
taped a piece of paper on top of the support boards. With the canopy in
position, I traced (projected) the base of the canopy onto the paper on the
support boards. I also made a small fixture (picture left) to hold up a ruler such that I can
measure the horizontal distance between the base (of the canopy) and the surface
of the canopy, at 3" above it. I took a measurement every 1" along the
entire perimeter of the canopy. Once I gathered all the dimensions (3"
above the support boards) , I projected them onto the paper (shown below).
Then
I laid the paper on top of one side of the 3" foam block and traced the base
outline onto the foam with my roller wheel. Then I flipped the foam over and traced the other outline
(i.e. the 3" height outline) on the back side. Note the two colors of the
foam? One is 2" yellow and the other is 1" blue ( a total of 3").
Once
completed, I carved out the foam as shown. This gives me a good starting point
in shaping the foam to the curvature of the canopy. It is much easier to shape a
few large foam pieces than 50-60 small pieces. This is a single piece I carved
out for the nose of the canopy (upside down).
Moving Along...
I calculated
that I can make the entire foam skirt with the spare foam I have on hand, but I
have to group them into 3 foam sections - canopy front, IP slots (left
& right) and canopy sides (left & right).
The
first foam block is the 1" thick urethane block wedging inside the wire
trough. I tackled this first just to get some feel for the idea. If the idea
doesn't work, I just throw away this small piece of foam and go back to the
plans method. On the other hand, if this works, I'll have a nice side profile to
pass onto the adjacent block. I repeated this on the right side as well.
The
second set is the foam block around the front end of the canopy. Note that all
the foam is either 3" or taller. I will eventually trim them all to the
appropriate height level with my nose template I made in the previous section.
Due
to the size of spare foam blocks I had, the canopy sides come in 3 block sets -
a 2" block right next to the IP, then a 12" x 10" block and then
the long 23" x 4" block set. I used the same paper templates as above
for shaping the foam blocks.
Here's
a picture when both sides were done... Note that the top of the foam is 3"
- a bit higher than the tape line. The top of the foam will be carved to the
appropriate profile using the 2 side nose templates I made earlier.
[After Thought] This approach in cutting the foam should save some time compared to the plans method because I am handling 9 large blocks of foam instead of ~60 small ones. In addition, it is easier to give a nice flow to the surface when shaping a long piece instead of many many small ones. However, there is a draw back - it is harder to see the foam/canopy interface between the ends (or in the middle). In addition, I won't have a joggle underneath the bottom edge of the canopy cover. However, some builders just remove the joggle later anyway.
[Hindsight]
I was not certain with the outcome (with my foam carving method above) as to how
well the foam 'hugs' along the canopy - until I cut out the turtle back and flip
it open later on in this section. I was happy to see that it turned out nicely
...The
foam hugs along the canopy throughout except a slight bit of separation at the
forward tip of the canopy...I can handle that!
The nose cover
was pretty straight forward. I cut up a 2" urethane foam per plan. I have
to shape the front slope (the surface that butts against F0) so that it fits
flush. The back end was just 45o per the drawing. I have to
shave the top of the fuselage sides flat so that the nose cover can lay flush. I
was pleased to see that the flattened top of the fuselage sides have the same
height profile as the F5 opening. That means I should get a good seal to keep cold air out from the landing
gear opening and nose sides as well.
The canard cover is a bit more complicated. I have to fill the hole, where the canard resides, such that the canard cover can be supported during the shaping process. I had a tough time deciding which surface to carve first - the top or the bottom (canard interface). I finally decided to carve the canard interface first and then carve the top using the side cover templates I made in the previous section. I hope it works!
I
microed a couple blocks of foam together - enough to cover the profile of the
canard as well as clearing the top of the cover templates. I traced out the
canard profile on both sides of the foam blocks. I glued 3 pieces of 100 grit
sand paper around a long cardboard tube (from BID cloths) and removed the excess
foam.

Here's how it turned out.
Then
I filled the gap with a slit of foam and completed the foam preparations.
First,
I removed the canard. Next, I hot glued all the foam blocks back in place. Then I
mounted the pair of templates to the sides of the fuselage. I used a long
sanding block, saw blades, sanding stick and whatever I could imagine to shape
the blocks. I had to remove a lot of foam and dust flew everywhere. After a good
4 hours, I got the foam to conform to the template profile.
I
decided to start shaping the canopy deck first. I removed the templates and
started with 36 grit sanding stick, then to sanding belt (by hand), then to foam
blocks. I made the templates (at FS41, 50, 60, 70) per plan though I did not
expect to use them much because I changed the height of the tape line. However,
they turned out to be useful... I held the corresponding template at the
appropriate FS location and with a see-saw motion, I dug a trench into the foam
blocks. The trench gave me a clue as to how deep to sand...it turned out easier
than expected. Here's a work in progress picture (left). Note the sanding
blocks and the sanding belt I used for the task.
I
had to remove the canard foam block so that I could use the F28 profile to help
shape the front edge of the skirt. Here's a shot of the completed canopy
skirt.
I
expected the nose cover to be the easiest of the three - except I had a tough
time getting it to the shape I like. The plan suggested keeping the center of
the cover higher than its sides, which I tried. I had a difficult time to take
the same amount of foam from both sides and keep my sanding OFF the center line.
A bit more on this side, then a bit more on the other side... I ended up taking
too much foam out about 6" above the nose and resulted in a concave shape profile
...
I
popped the nose cover off, including the joining strip between the nose and the
canard cover. Fortunately, there was enough urethane foam left over for another
nose cover - though I have to glue a couple of blocks together. This time I was
a lot more careful and I added a curvature board to gauge the center curvature.
I also added a tape to the center line (per Wayne Hicks suggestion) - just to
establish a "hands off zone". The second time turned out much better.
Shaping the cover is suppose to be done in Chapter 24. Since I am shaping all 3 covers at the same time, I have to jump ahead. Note the small foam joining strip was added temporarily to help me to visualize the transition from canard cover to the nose cover - which is the biggest challenge for me. Notice that slight elbow at the small yellow foam blocks? Eventually I got it to flow better (picture below)...

Here's a shot of the profile with the center line contour template. Note the sand paper (at the front of the picture) that is taped against the canard? I used it to shape the base of the strip (yellow) so that it sits nicely against the canard profile.
Here's
a picture of the covers completed. Notice how
colorful my foams are - not intentional - just running out of large foam
pieces...![]()

Here's another shot of the completed covers and its profile. Took quite a bit of effort, but its worth it...
I
did not do anything special with the transition blocks. I just made mine in such
a way that the glass will lay down nicely - since it will be covered up later.
The plans did not provide any direction as to the shaping of the canopy flange forward of the cut line. It really doesn't matters much since I bought my canopy from Featherlite and that I raised it by 1". I went ahead and trim the flange as I have done in the aft half.
I followed the plans in contouring the forward cut line. There seems to be some confusion on its outboard positions. I used the 4 1/2" aft F28. However, that is about 1" forward of my forward hinge - which is different from what is shown Fig.45. I contact a couple senior builders and theirs were the same as mine...moving forward!
I
have to scratch my head a bit in determining the 4 1/2" position from F28
(on both sides) since the fuselage is curved. Here's a picture showing how I did
it. Once I established the 4 1/2" position on one side, I used the aft edge of the canard as a 90o reference point - at
least both sides will be the same. If I remember correctly, it turned out to be
~18.5".

Here the top view of the completed forward cut line plus the 1/16" x 1" groove over F28.
I
dug a 1/4" groove along the canopy tape line per plan. As recommended by
many builders ahead of me, I made a paper template to aid me in cutting the
glass. I taped the template (half of the canopy deck) under a sheet of plastic
and the lay the BID and UNI respectively for cutting.
I applied micro and glassed in the 1st layer of BID (right & left), overlapping at the front, a couple inches off center (portside). Then I filled the groove with dry flox somewhat up to the tape line. Right before I glass the 2nd layer of BID, I brushed the flox with pure epoxy, thus giving it a very smooth surface. I shaped it a bit below the tape line. Then the 2nd layer of BID goes on, overlapping at the front, a couple inch off center (starboard side).
I
wet out and squeegee out both layers of UNI together between a plastic sheet and
a saran wrap - because they can be handled easier without falling apart. Once
wetted out, I removed the plastic sheet and lay up the UNI onto the canopy deck
while the saran wrap is still on. There is no overlap on the UNI layers, they
just met up at the center.
I think the most important step in getting a clean line is in the final peel ply step. I made sure the peel plies are wetted out nicely, especially at the canopy tape line, giving it a well define line and covering all the rough edges of the glass underneath.
I followed Wayne Hick's advise and extend my lay-up a bit longer down the port side (~1") such that it will provide a better canopy seal against the longerons down the road.
I
decided to build the turtle back support frame before sawing through it. I just
followed Fig. 48 per plan. I used a combination of screws and bondo to hold the
support frame in place. Will see how well it holds when I tip it over. BTW, I
found it hard to keep the top of the frames even (front and the back) because
the canopy deck is not even to begin with. I decided to level it afterwards.
Once
the bondo cures, I took my FEIN tool and saw through the turtle back along the
cut line (marked earlier). I was careful not to cut through the drip rail. Then
I used a steel blade and loosen the glass from the duct tapes along the edges.
It was a bit more challenging than expected, but I got through it...
With
4 people, one at each corner, we managed to pick up the cut out turtle back and
place it on the floor up side down. The fuselage, however, was a mess - ripped
tapes hanging all over the place, foam dust scattered into every crack...Took
quite a bit of work to clean them up especially removing the residue glue left
over by the duct tapes. Here's a picture of the drip rail after I remove the
foam strip. Its good to be able to see inside the cockpit again!