Total Time = 462hrs

Chapter Title Description Date Started Date Finished Time spent
Chapter 4 Bulkheads 2/23/2001 4/2/2001 54.3
Chapter 5 Fuselage Sides 4/9/2001 6/21/2001 74
Chapter 6 Fuselage Assembly 6/21/2001 9/15/2001 50.5
Chapter 7 Fuselage Exterior 9/15/2001 12/22/2001 34.2
Chapter 8 Headrests and Seatbelts 5/6/2001 working 22.7
Chapter 9 Landing Gear/Brake 10/27/2001 working 77.2
Chapter 10 Canard 11/14/2001 02/01/2005 36.7
Chapter 11 Elevators 7/01/2002 9/13/2002 20.0
Chapter 12 Canard Installation 02/03/2005 03/12/2005 22.4
Chapter 13 Nose Section 01/02/2005 working 83.5
Chapter 14 Center section spar      
Chapter 15 Firewall       
Chapter 16 Control Systems 4/01/2003 working 39
Chapter 17 Trim Systems      
Chapter 18 Turtle Back and Canopy 02/18/2006 working 36
Chapter 19 Wings       
Chapter 20 Winglets and Rudders      
Chapter 21 Strakes and Tanks      
Chapter 22 Electrical System      
Chapter 23 Engine Installation      
Chapter 24 Covers and Fairings 01/01/2006   35.0