Sun 21 |
11
|
Glassed the bottom of the elevators. |
3 |
Mon 22 |
11
|
Sanding leading edge. Trimmed trailing edge.
Removed some trailing edge foam. Ready to glass tops. |
2 |
Wed 24 |
11
|
Glassed the tops of the elevators. Microed the
trailing edges. |
3 |
Thu 25 |
11
|
Trimmed the elevator layups. Squared the trailing
edge. Squared the outboard edge. Glassed the outboard edge. |
2 |
Fri 26 |
11
|
Trimmed elevator ends. Fit NC-6's into place. |
1 |
Fri 26 |
10
|
Cut all glass and peel ply for canard bottom
layup. |
2 |
Mon 29 |
10
|
Sanded the canard leading edge |
1 |
Wed 31 |
10
|
Added new
jigs to bottom of canard and flipped it over. Removed the fishtail
and sanded to shape. Removed peel ply. |
3 |