Log Entries - March 2004

DateChapterDescriptionHours
Mon 1 16 Trimmed glass in IP cutouts. Made holes in seatback for electrical. Trimmed electrical holes at front landing gear bulkhead. Cut foam for electrical conduit. 3
Tue 2 16 Trimmed glass on bearing blocks. Mounted controls on both sides of fuselage. Complete except for drilling CS122/CS121 and floxing CS123. 3
Tue 9 16 Twisted CS124. Drilled CS122 to CS121. Floxed CS123 into place. 2
Wed 10 16 Shaped foam for electrical conduits. Taped to table and added one ply BID to both. Cut Nylaflow tubing for rudder cables and layed out flat. 3
Thu 11 16 Cut and prepped electrical conduits. Ready to be glued into place. 2
Sun 14 18 Cut 5 boards from 3/8" particle board. Printed turtleback jigs and glued to boards. Rough cut five jigs. 3
Sun 14 16 Mounted canard and elevators. Measured, cut, drilled, and mounted CS102 and CS136 for elevator pushrods. I have working elevators! 2
Thu 18 16 Adjusted hole in IP for elevator pushrods. Cut, finished, and mounted CS-125L to the two CS124 brackets. Put canard back on the ceiling. 2
Sun 21 16 Floxed the electrical conduits onto the right side of the fuselage. 1
Sun 21 24 Made mold for map pockets. Taped onto table, setup glass. Cut, shaped, and fit foam for right front arm rest. 5
Mon 22 24 Began cutting foam for right rear armrests. 1
Sun 28 24 Cut foam for most of right rear armrest. 2
Mon 29 24 Finished cutting pieces for right rear armrest. 1
Tue 30 24 5-minute epoxied all the pieces for the right side armrests. 2
Monthly Total 32