Mon 1 |
16
|
Trimmed glass in IP cutouts. Made holes in seatback for electrical. Trimmed electrical holes at front landing gear bulkhead. Cut foam for electrical conduit. |
3 |
Tue 2 |
16
|
Trimmed glass on bearing blocks. Mounted controls on both sides of fuselage. Complete except for drilling CS122/CS121 and floxing CS123. |
3 |
Tue 9 |
16
|
Twisted CS124. Drilled CS122 to CS121. Floxed CS123 into place. |
2 |
Wed 10 |
16
|
Shaped foam for electrical conduits. Taped to table and added one ply BID to both. Cut Nylaflow tubing for rudder cables and layed out flat. |
3 |
Thu 11 |
16
|
Cut and prepped electrical conduits. Ready to be glued into place. |
2 |
Sun 14 |
18
|
Cut 5 boards from 3/8" particle board. Printed turtleback jigs and glued to boards. Rough cut five jigs. |
3 |
Sun 14 |
16
|
Mounted canard and elevators. Measured, cut, drilled, and mounted CS102 and CS136 for elevator pushrods. I have working elevators! |
2 |
Thu 18 |
16
|
Adjusted hole in IP for elevator pushrods. Cut, finished, and mounted CS-125L to the two CS124 brackets. Put canard back on the ceiling. |
2 |
Sun 21 |
16
|
Floxed the electrical conduits onto the right side of the fuselage. |
1 |
Sun 21 |
24
|
Made mold for map pockets. Taped onto table, setup glass. Cut, shaped, and fit foam for right front arm rest. |
5 |
Mon 22 |
24
|
Began cutting foam for right rear armrests. |
1 |
Sun 28 |
24
|
Cut foam for most of right rear armrest. |
2 |
Mon 29 |
24
|
Finished cutting pieces for right rear armrest. |
1 |
Tue 30 |
24
|
5-minute epoxied all the pieces for the right side armrests. |
2 |